Relation to CDPS Stormwater Requirements  


Latest version.
  • The Erosion and Stormwater Quality Control Plan has been structured to meet the requirements of the CDPS Stormwater Construction Permit, in addition to City requirements. It is anticipated that a single plan could meet both State and City requirements. However, City requirements for the Erosion and Stormwater Quality Control Plan are more inclusive than State requirements for a Stormwater Construction Permit. In addition, the developer should note that compliance with one program does not fill the need to comply with the other. Currently, a CDPS permit is required whenever the site disturbance exceeds 1 acre.